From:                              route@monster.com

Sent:                               Thursday, January 28, 2016 5:15 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: OSP Engineer

 

This resume has been forwarded to you at the request of Monster User xapeix03

Christopher Villiva 

Last updated:  11/29/14

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Shawnee Mission, KS  66203
US

Mobile: 620-212-5099   
Home:
620-378-4676
christophervilliva767@gmail.com
Contact Preference:  Telephone

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Christopher Villiva - Field Engineer Telecommunications

Resume Value: kkj34hdk2mjgvgbz   

  

 

Christopher Lee Villiva

Field Service Engineer Telecommunications

 

                                                                                    

224  West .Maple Street

Quenemo , Ks. 66528

 

Cell 620-432-1300

Christophervilliva767@gmail.com

 

 

 

 

 

o                                              

Top of Form

Bottom of Form

 

BACKGROUND

Top of Form

Bottom of Form

SUMMARY

I am interested in any Installation or Un-Installs jobs available with your company. I have sixteen years in experience in the telephone industry. I have work experience on major brands of equipment used in the telephone industry. I have worked in forty nine states since 1988.Willing to Travel, Locations for Central Offices, Co-Locates, Cell Sites , and Hut

 

 

 

 

 

Field Service Engineer

C4 Technical Services, GDT, Verizon

September 2013 – Present (3 months) Colorado Springs, Colorado

Installation-  Cisco Nexus 7000 Series, and Cisco Nexus 2232 PP 10 GE, and 1 GE Fabric Extender.
Juniper MX960,   and Juniper 5800's. Running, and Terminating LC to LC Fiber 48's, and 96's including Testing. Installation of DCS Connectivity   Innovation  Boards Primary+ Secondary CDS FEX..

Field Service Engineer

C4 Technical Services

September 2013 – September 2013 (1 month) Oklahoma City, Market. GDT, Verizon

Installation- Cisco Nexus 7000's, and 9000's
Mounting floor anchor's   for eight cabinets.
Running,  and Terminating power for ADC fuse panels.
Running, and  terminating ,  grounding for equipment.
Labeling.

Field Service Engineer

Parsons, AT&T

August 2013 – September 2013 (2 months)Chicago Market

UMTS Installation DUW, SAU for RBS 6601 Cabinet
Terminated power, and grounding. Ran alarm cables with power for SAU.
Installed 66 blocks punch down 1-8 alarm cable. Installed RAYCAP.

 

 

 

Field Service Engineer

Johnson Service Group, Inc

May 2013 – Present (3 months) LA, MS , AL. Market AT&T, AFL

AT&T UMTS Harvest
Responsibility's-  Harvesting of Rax Boards, and Installation of Blanks for NODe shelfs.
COP's for each cell site, Screen shots, Pictures of PRE- POST, and POST, ALRMS, CV, HEALTH CHECK. Packaging, and shipping of Rax Boards.
AT&T Support MIC Bridge,  and NFSD.

 

 

 

 

Field Engineer Telecommunications

Johnson Service Group, Inc, AFL, Ericsson, T-Mobile

February 2013 – Present (3 months) Connecticut Market

Responsibilities-Installation, and Integration RBS Cabinet's Technology's
Trouble Shooting-GSM, PCS,AWS, LTE, Alarm Clearing.
2C Outdoor
2C Hybrid Outdoor
4B Outdoor
Installation of Modernization Kits for Power Upgrades, and Integration
Installation of BFU, PDU's, PSU's, DUG, DUL ,DUW's ,XCU,SHU,SCU,SAU,GPS Kits ,SPC's ,Hybrid cable ,and Fiber. all powering, and cabling of equipment.7705, and LMU Migrations.
Software for project- Element Manager, Hyper Terminal, OMT, WS-FTP,
Tools for project- LDO-AMS for Ericsson, Daily Activity Reports.
Communication with NIC Support, NOC, and TMO local switch, Config, and Scripts for 
each    Site.

 

Field Engineer Telecommunications

CWF Solutions, C4 Technical Services

November 2012 – February 2013 (4 months) DC Market, VA Market ,Quanta Wireless, Ericsson, T-Mobile

Responsibilities-Installation, and Integration RBS Cabinet's Technology's
Trouble Shooting - GSM, PCS, AWS, LTE, Alarm  Clearing.
1 A T-Mobile Outdoor with AIR 21
1 B T-Mobile Outdoor 6102 AIR 21
1 B T-Mobile Indoor RBS 6201 AIR 21
2 C T-Mobile Indoor AIR 21
2 C T-Mobile Outdoor AIR 21
2 C T-Mobile Hybrid Outdoor RBS 6102 AIR 21
2 C T-Mobile 4 Sector Outdoor RBS 6102
3 A T-Mobile Indoor RBS 6601
3 A T-Mobile Outdoor RBS 3106
4 B T-Mobile Outdoor Cabinet Rip ,and Replace
4 B T-Mobile Interim Cabinet Rip, and Replace
4 B T-Mobile Indoor Cabinet Rip ,and Replace
4 B T-Mobile Outdoor 4 Sector Outdoor RBS 6102
Installation of BFU,PDU's, PSU's ,DUG ,DUL ,DUW's ,XCU ,SHU, SCU, SPD's, GPS Kits, Hybrid Cable, and Fiber. Powering , and Terminating all equipment.
Software for project- Element Manager ,Hyper Terminal ,OMT ,WS-FTP, Tools for project- LDO-AMS for Ericsson ,Daily Activity Reports, Trinity for Time Sheets. Communication with NIC Support, NOC, and Ericsson Bridge for check in, Configurations, and Scripts for  each Site.  Migration of LMU and, 7705 Decommissioned   JDSU.

 

Field Technician Telecommunications

Outsource Telecom- Black Box, PVAP

October 2012 – October 2012 (1 month) Kansas City, MO. Sheridan Hotel

Sheridan Hotel- Trouble Shooting Cisco Wireless AP's   Locations.
Running, Terminating, Testing Cat 6 Cables from AP's to Patch Panels. Punch Down Panels at Remote Switch, and Network Room.
I ran, and Connected Fiber Jumper Cabinet to Remote.
Removed old AP's, Mounted New AP's on ceiling Grid, and Walls.

Field Technician Telecommunications

CWF Solutions , Quanta Wireless, Ericsson

September 2012 – October 2012 (2 months) Kansas City Area

Battery QA Audit for Ericsson- Cell Sites 
Adding and Terminating two Power Cables.
Removing, and Adding Batteries.
Adding Straps , and Drain Tubes.
Adding Temperature Sensors

 

Field Technician Telecommunications

CWF Solutions, GDT, Verizon

September 2012 – September 2012 (1 month) Des Moines, IA

Responsibilities- Running Cable, Labeling, Terminating 192 RJ-45 Connectors, And Testing 96 Cat 5 Cables. Running, Labeling, Testing, and Terminating 108 Fibers to ADC Fiber Shelves.

Field Technician Telecommunication

Tek-Systems, TransTel,

July 2012 – August 2012 (2 months) Enid, Oklahoma

Responsibilities- 4 story Convention Center In Enid, OK.
Running All Cat 6 Cable from each floor to Net Work Room. For all Voice, and Data for building. Created, and Red Lined all Path Ways for Cabling to be ran. We Hung, and Mounted J Hooks 2"and 4" using Strain Wire off Grids, Sammy's Screws from Ceiling, and Beam Clamps.

Field Technician Telecommunications

R&R Solutions

April 2012 – July 2012 (4 months) TX, NY, NV, CO, CA, JC Penneys

Roll Out JC Penneys

My Responsibilities-Lead Tech Using Air Magnet For Survey of JC Penney's Store Coverage for new AP's in Stores. We used Portable AP's with Laptops.
Lead Tech- For Site Assessments Documenting Cable runs to devices OMR to LP Office,  MFP, Helius or Hughes, MBOX, And Remote Closets, and Wireless Remotes. A inventory of Switches, Router Patch Panels ,Fiber Trey ,Cabinets, and a new location for new 4' Cabinet, and Equipment for Cut Over .
Lead Tech- Cut Over, Removed all Excisting Equipment, and Newly Installed Cisco 2951 Router, ASA's 5525 Fire Walls ,Cisco 3560's, and Acatel 2690's stacked switches, Paduit punch down jack panels  ,and Wire Minders. Also UPS'S and Shelves .Ran Patch Cables for all Devises, and Equipment, POS,NON-POS,V-LANS,AP'S, PC'S Removed all old AP's from Store, and made sure store up, and running.

Field Technician Telecommunications

CWF Solutions

March 2012 – April 2012 (2 months) Philadelphia ,PA Area-GDT, and T-Mobile

My Responsibilities- Full Installations of Cisco Nexus 7000 Series, Cisco ASR 9000 Series, Cisco Catalyst 4900m,Cisco Catalyst 4948 E, Lantronix Secure LINX SLC48,Telect Fuse Panels , Telect LCX, Cat 6 Panels, and Fiber Panels .Inventoried Materials For Project. I Mounted Bays, and Built Top Supports with Ox-Bar, Threaded Rod ,J Bolts ,and Isolation. I Ran, Dressed, and H-Tapped Isle Grounds. I Ran ,Dressed, and Terminated Power for A and B Side for all Equipment, and Fuse Panels. I Ran, Dressed, and Terminated Grounding for all Equipment.1 OT to 2awg for Power, 6awg for Grounding I Ran, and Terminated, and Tested with Fluke Meter, Cat 6 Cables from Equipment to Consoles.

 

 

 

 

 

Field Technician Telecommunications

CWF Solutions

February 2012 – February 2012 (1 month) Philadelphia, PA Area- AT&T,AFL

My Responsibilities- Reading Cable ,and Fiber running list .I ran and dressed in Fiber from DGX To ADC Fiber Panels on Ladder Rack .I Labeled ADC Fiber Panels. I Ran and Sewed in Fiber from floor to floor as well as in Floor Tile. I Ran, and Dressed in 2awg Power Cable threw Ladder Rack, Water Falls ,and Floor Tile.

 

Field Technician Telecommunications

CWF Solutions

January 2012 – February 2012 (2 months) Bismark, North Dakota- DCN Telecommunications ,Grey Bar ,ADC

Responsibilities- Inventory of materials for new installation of equipment office. I built, and Mounted Ladder Rack, Threaded Rod,J-Bolts,G-Clips,Splices,Ox-Bar,30",20",12" Rack, and Fiber Tray,Bays,DSX-3,And DSX-1 Panels.

 

Field Technician Telecommunications

CWF Solutions

December 2011 – January 2012 (2 months) Rochester, Albert Lea ,MN. Century Link

Responsibilities- I Mounted, Dressed, Stripped, and Wire Wrapped 26awg. Seven Verticals 100 Pair Blocks to Main Frame. I Mounted, Dressed, Prepped, and Wire Wrapped nine Horizontal 100 Pair Blocks to Main Frame 26awg wire. AD Tran Total Access  5000.

Field Technician Telecommunications

CWF Solutions

October 2011 – December 2011 (3 months) Dickinson, Mandan, North Dakota - Century Link

Responsibilities- Full Installation of 3 Fujitsu Fw 4100E
I Installed DSX-3 Panels, three ADC Fiber Shelves, and seven DSX-1 Panels. I ran ,and Laced Cabling to Main Frame. I ran ,and Laced all Power ,and Grounding to Shelves .I Tested Fiber .I Wire Wrapped 26 awg, and 22awg for DSX-1 Panels. I Installed, Dressed ,and Wire Wrapped fourteen 100 Pair Blocks to Main Frame .H-Tapped 1ot to 2awg for Power.

 

Field Technician Telecommunications

CWF Solutions

October 2011 – November 2011 (2 months)Minneapolis, Minnesota ADC,AT&T, Century Link

Responsibilities-Installation of Symmettricom, Dantel Point Master Eagle, Tektronix Geoprobe Network Assurance, IOLAN STS,Di-G2CUL 84 Port ,Alcatel-Lucent 7750 SR-12 Service Router, Spirent Test Center Live 7500 Series ,ADC Patch Panels,DSX-3 Panels ,and ADC Fiber Trays .I ran 1ot from Fuse Panels to BDF, and Laced .I ran Fiber from ADC Fiber Panels six floors to DGX, and Tested Fiber 72 Port ,and Laced .I Opened and Closed Fire stop Holes. I inventoried Equipment for next job .I ran and Labeled Cat 5 cable to ADC Punch Down Panels.

 

 

Field Technician Telecommunication

CWF Solutions

September 2011 – October 2011 (2 months) Bellville, ILLinois-Saint Louis, Missouri ADC,AT&T ,Wind Stream,

My Responsibilities- I installed Cisco ME 3400E Series, and Acced IAN Networks EtherNID at five Cell Sites ,I also installed Cisco ONS 15454 (M6).I installed Fiber Tray, and brackets, also ran ,and Terminated Fiber. I ran ,and Terminated, and Laced all Power, and Grounding. I ran Terminated,  and labeled ,Tested 32 Fibers from ADC Fiber Optic Shelf (DGX) to MSP.I ran four Fibers from Core director to MSP. I ran Timing two Cat 5 from MSP to Telecom Solutions Panel.

Field Technician Telecommunications

Ian Martin Limited

July 2011 – August 2011 (2 months) Lenexa Kansas ( Sprint PCS)

My Responsibilities-I installed a Nortel Multi Service Switch 15000 for Sprint .Reading Spec's Installing Ladder Rack ,ADC Fiber Tray ,Running power cable, and Lacing cable. Also running ,and terminating Alarm cables.

Field Technician Telecommunications

Tek-Systems ,and Wachter

July 2011 – July 2011 (1 month) Fort Myers-Miami Florida.(Apple Stores)

My Responsibilities- Apple Store Upgrade

Roll Out

I Installed Cisco 3900 Router's
Using HP Notebook Microsoft Outlook and Excel.
Rack Elevation-ISR for Network Rack and AV Rack.
Connections to Ports on Console and DIS Switch.
Testing for BOH and FOH from DIS Switch Configuration on Notebook with Cat 6 cable.
Status Reports and Communications with Help Desk through out project.

Field Technician Telecommunications

CWF Solutions Telecommunications

July 2011 – July 2011 (1 month) Oklahoma City, Oklahoma (AT&T)

My Responsibilities- I laced Power cable 1 ot, to ladder rack. I Terminated BNC'S 735A ADC DSX'3 Panel 48 port, and tested each one. And dressed in.

Field Technician Telecommunications

CWF Solutions Telecommunications

February 2011 – February 2011 (1 month) Ottawa, Kansas (Century Link)

My Responsibilities- Delivering Telecommunications Equipment to Central Offices, nine locations through Kansas. Century Link Telecommunications. I used 27' foot Ryder Truck with lift gate to each location. Did inventory to each site by computer.

 

 

Field Technician Telecommunications

Associated Tele-Networking,Inc

November 2010 – December 2010 (2 months) Waipahu, Hawaii (Verizon)

Un-Installation

My Responsibilities- Main Central Office of Hawaii for Verizon Telecommunications has relocated.

Scanned Cards for Titan 5500's,3600's, and Lucent SE Switch. Put cards in Static bags with wrist strap, and labeled ,and boxed with bubble wrap for shipping. Removed SE Lucent Switch, Titan 5500's &,Titan 3600's,Cisco Catalyst 6500's,Alcatel-Lucent Junipers,  Sun equipment,DSX-1's,DSX-3's Panels, and Cabinets. Mining out all Cabling. Organizing equipment to be shipped. Bubble wrapping on to Pallets, and putting shipping labels on. Loading 40 foot Containers with Fork Lift ,Kick Back dolly, and Floor Jack. Replacing  Floor Tiles.

Field Technicians Telecommunications

Associated Tele-Networking,Inc

October 2010 – October 2010 (1 month) Wichita, Kansas (Verizon)

Un-Installation

My Responsibility's- Removals of Nortel Nodes 0C-12,0C-48'S, for Verizon Telecommunications. Removing cabling , Relay Racks, and equipment. Driving 27 ft Penske Truck. 11 locations through out Kansas. Communicating with C.O.E Techs ,and O.S.P. Job Complete with Method Of Procedure.

Pumper

Admiral Bay Resources

August 2008 – April 2010 (1 year 9 months) Chanute Kansas

Responsible-Monitoring, and Alarms of Boosters, Draining Drips. DEHY Plant 100 BTU, Changing Out Filters ,Monitoring H2o Readings,H2s Also. Changing Out Pumps. Treating Wells with Chemicals and Pellets .Pumped and Maintained 47 Wells.P.C. Drive Heads Maintenance-Greasing, Repacking, Replaced Wiring of Control Boxes, Drive Heads, Keypads. Pump Jack Maintenance, Replacing, Plumbing, Kim Rays, Separators, Belts ,Orifice Plates, Leveling, Greasing, Cone Packing, Polish Rod Liners, Bucket Test, Fences ,Replaced Motors, and Fuses. Monitoring Production of Total Flow Meters.

Working Supervisor

Petrol Oil and Gas Inc.

May 2007 – August 2008 (1 year 4 months) Thayer, Kansas

Responsible-Production for four Boosters Monitoring and Alarms .DEHY Plant 250 BTU, Changing Out Filters, Maintenance and up keep of Glycol Level,Pumps,H2o Readings. Amine Unit-Replacing Filters Daily, and Pump Changes,Co2 and H2s Readings .Treating Wells Chemicals 92895,550,9655 Weekly, chemical Stix Monthly .Dealing with Vendors, Land Owners, and three Pumpers. We Used 7 day Charts. Changed Out Orifice Plates Frequent ,and Coefficients.104 Wells P.C. Drive Heads and Pump Jacks .Salt Water Disposals Readings and Acid Monitoring. Maintenance-Rewiring Electric Boxes ,P.C. Drive Heads ,Pump Jacks, Replacing Motors, Lightning Protectors, Fuses, Belts, Ground Faults .Reading Electric Meters once a Month. Maintenance of Pump Jacks Leveling, Greasing, Replacing Cone Packing ,Belts ,Shivs, Pullyes, and doing Bucket Test Weekly .Replacing Well Head Compressors,Plumbing,Kim-Rays,Separators,Fences.Maintenance-P.C. Drive Heads-Greasing ,Repacking, Monitoring Pulling Units-Locations and Trouble Shooting.

 

Rig Hand

South River Resources,LLC

February 2007 – May 2007 (4 months) Chanute Kansas

My Responsibility's- I worked on two Pulling Units.
Maintenance of Rigs, and Company Trucks ,and Mud Pump.
I ran Casing, Pump Changes ,Shake Up Jobs.I ran Tongs, and Ranched Rods, Tailed Rods Doubles ,Ran Elevators ,Built Fences and Corals around Leases, Loading and Unloading Trucks ,and Trailers, Welding for Maintenance.

Lead Sprayer

R.S. Pretsige

March 2006 – January 2007 (11 months) Neodesha, Kansas

My Responsibility's-Spraying of all parts ,and cabinets with Top coat, enamels, sealer, and glaze .Four Hundred Parts a Hour in a spray booth, Repaired Parts, Wiped Glaze ,and Built Frames, Separated materials.

Mig Welder and Painter

RK Fabrication INC.

December 2003 – April 2006 (2 years 5 months )Fredonia, Kansas

My Responsibility's-Structure for Super Wal-mart and Auto Zones. Door frames, roof hatches, Beams, Columns, Cutting Material ,Drilling Holes, Loading Racks, Ran Paint Room for all materials, and Parts. Certified Fork Lift Operator

General Plant Maintenance

Archer Daniels Midland

November 2002 – December 2003 (1 year 2 months) Fredonia, Kansas

My Responsibility's-Maintenance on pumps, equipment ,and cleaning of the plant. Cleaned out belt drives for Soybeans ,Corn. Drove Bob Cat for loading trucks. Cleaned out equipment on a regular bases.

Field Supervisor Telecommunications

C.T.S Construction and Telecom

May 2001 – August 2001 (4 months) Wichita, Kansas

I installed CACS Navigators Systems, and OC-48,OC-12,OC-192,FLM-2400's high speed, and trib shelves, Alcatel 3003 mux. Responsibility's- Method Of Procedure, Inventory, Reading Prints, and Red lining changes ,Communicating with Central Office Tech, Standards Inspection, Ran, and wire wrapped cabling for DSX-1 Panels, ran, and Terminated BNC'S for DSX-3 Panels, Ran, and terminated Fiber, Installed Ladder-racks, Anchored to Floor tile,, with Brackets, Hangers, Un-strut, Threaded rod, Routing, and Termination of Power Bay, Ground Bar location .Duct work, Fiber trays ,Job Completion.

Recruiter II and Sales Rep.Telecommunications

TAD Telecommunications

February 2001 – May 2001 (4 months) Olathe, Kansas

Representative Responsible- for Screening, Drug Testing, Hiring Package for Central Office Installation workers, and OSP Operations. Communicated with employees, and Customers. I was a sales representative for Nortel, Sprint LTD ,Sprint North Supply, Sprint PCS. I am familiar with Microsoft Excel, Resumate, Outlook 2000, and Windows 98,and XP. I Relocated a Dell Server, from one location to another in Sprint North Supply. Tested and Turned Up equipment.

Field Supervisor Telecommunications

Telecommunications Installation Corp.

September 2000 – January 2001 (5 months) New Orleans, Louisiana

I installed CSIL Narrow band Dax Alcatel Systems. E-spire Co-Locate,3003 Alcatel Mux,M-13's.My Responsibility's-Method Of Procedure, Communication with Central Office Tech, Power cut, Cabinet Shelves, Added Ladder rack ,Duct work, Ran cabling to Blocks, Ran fiber and terminated. Grounding, Installation of Cards, Labeling, Wire wrapping, sewing of cable , anchored and installed two bays ,Tested and Turned Up equipment. Job Completion.

Field Supervisor Telecommunications

Tek-Systems and E.F.I Solutions

December 1999 – July 2000 (8 months) Atlanta, Georgia

I installed CISCO 12012,Gigabit switch routers. GX-550's Hardware, Responsibility's -Method Of Procedure, Site survey of locations. Communication with Central Office Tech, and Bank management, as well store owners .Fishing cabling threw all locations. Off duty Police with me for security at each site. high capacity ATM switching system (25 GBPS). Changed out lease lines for Commerce Bank, Inc. ATM machines to the server. Also Installed new modems,routers,CAT3 & 5 cable, and RJ 45 Connectors. Tested and Turned Up each location, Job Completion.

Lead Installer Telecommunications

Global Installers Network

November 1999 – December 1999 (2 months) South Carolina, Colorado, North Dakota

I installed Fujitsu FLM 150's and 2400's high speed Trib Shelves, and Blue Star Internet Servers. Responsibility's- Method Of Procedure, Reading prints, and red lining changes, Power cut ,Communication with Central Office Tech, Standards Inspection, Site Survey ,Ran Fiber and Terminated threw fiber trays. Timing terminated in Telecom Solutions Panel. Relay Rack assembly, Ladder rack Installation, Duct work ,Floor anchors ,Ran cable to all equipment, Installed and, Prepped, and wired twenty DSX-1 Panels, Stenciling, Routing to Power Bay, and Ground Bar Location ,Job completion.

Lead Installer Telecommunications

CDI Telecommunications

July 1999 – November 1999 (5 months) Atlanta, Georgia

I Installed Tellabs Titans 550's My Responsibility's- Method Of Procedure, Reading Prints, Red Lining Changes, Power cut, Communicating with Central Office Tech. Standards Inspection, Bay assembly ,Floor Tile ,Anchored, Brackets, Ox-Bar ,Hangers, Threaded Rod, Un-strut, Running cable to equipment, Sewing cable, and Banding, Wire Wrapping DSX-1 Panels, BNC's on DSX-3 Panels, Duct work, Fiber Tray, Routing of Power Bay, and Ground Bar Location, job Completion.

Lead Installer Telecommunications

DGI Technologies

March 1999 – June 1999 (4 months) Seattle, Washington

I installed D.G.I Trunk frames for EMX 2500's.I was Responsible-Method Of Procedure, Communicating with Central Office Tech. ran and terminated the T1 cables and PCM cables from the trunk frames to the Matrix .Tie wrapped, and banding, Labeling, Tested, and Turned Up, Job completion

 

 

Lead Installer Telecommunications

CDI Communications,Inc

February 1999 – March 1999 (2 months) Plano, Texas

I installed Nortel OC-12,OC-48, and OC-192.I was responsible for Method Of Procedure, Reading Prints, and Red lining changes. Communicating with Central Office Tech, Standards Inspection, Relay rack assembly, and Ladder rack, Floor anchoring, Fiber running, Cable running of DSX-1-Panels,and DSX-3 Panels, Sewing ,and banding of cable, Duct work ,Stenciling, Routing of Power Bay, and Grounding Bar locations. Power cut, Job completion.

Lead Installer Telecommunications

CDI Telecommunications,Inc

November 1998 – December 1998 (2 months) Plano, Texas

I installed Nortel OC-12,OC-48, and OC-192. My Responsibility's, Method Of Procedure, Reading Prints, and Red Lining Changes. Communicating with Central Office Tech, Inventory, Standards Inspection, Site   survey, Ran and Terminated Fiber, Relay rack assembly. Floor anchors, Ladder Rack, and Duct work  assembly. ,Fiber Trays. Stenciling, Labeling, Wire Wrapping DSX-1 Panels, BNC's Connections for DSX-3 Panels .Cable Installation for equipment. Sewing and banding of cables ,Routing of Power Bay and Grounding location. Job Completion.

Lead Installer Telecommunications

Point To Point Communications

April 1998 – May 1998 (2 months) Atlanta, Georgia

I installed Tellabs Titans 550's and 532's L's.

My responsibility's- Method Of Procedure, Reading Prints, and red lining them .Power cut, Inventory, Communicating with Central Office Tech, Standards Inspection, Bay assembly, Ladder Rack ,Duct Work, Stenciling, Cabling to equipment, Conducting wire wrapping to DSX-1 panels. BNC'S on DSX-3 panels. Floor Tile Mounting, rackets, OX-Bar, angers Uni-strut, Threaded Rod, Cable Routing to Power Bay, and Ground Bar Location. Job Completion.

Lead Installer Telecommunications

Fujitsu Network Communications

March 1998 – April 1998 (2 months) Denver, Colorado

I installed all Fujitsu Equipment, including Fractor NBS,FLM 2400 HS and Trib, FLM 150's.I was in charge of Method Of Procedure, Reading Prints, and Red Lining Changes. Power cuts , Inventory, Communicating with Central Office Techs, and Customers, Twelve empty Co-Locates when started, Built from ground up all of location. Including Battery Back up Systems, Ran and terminated Fiber, wire wrapping DSX-1 panels, BNC'S 734A&735A,DSX-3 panels, Bay installation, Ladder rack assembly, Grounding, Floor anchors, Labeling, Duct work, Fiber trays, Timing Telecom Solutions Panel. Cabling for equipment, and Power, Shelve Cards. Job completion.

Installer Telecommunications

Volt Telecommunications,Inc

December 1987 – January 1990 (2 years 2 months) San Francisco, California

My Responsibility's- Cable running for DSX-1 Panels, Cable running for DSX-3 Panels ,and sewing, and Banding. Relay rack assembly, Floor anchoring, Ladder rack Installation, Duct work, Mounting and Grounding of equipment.Labeling,Inventory,48 Locations.

CERTIFICATIONS

Top of Form

Bottom of Form

Basic Builder 3 Training Class

Ericsson Inc,, License Basic Builder RBS Qaulified

September 2011 – Present

AT&T LSO Courses

Electronic Job Folder-Using EJF #60124838 Intro To AOTS Change Management #51435907 Supplier Awareness-Network Space #60007518 Ask Yourself #51247894 Quality Installation NPE #60065363

January 2013 – January 2014

Trompetor Electronics Inc.

Certified in Coax Cable Prep&Connectorization Sizes 734A&735A

March 1998 – Present

Brittney Inc.

Fork Lift Safety Program

July 2007 – Present

Century Link and Quest

Christopher Villiva, CWF Solutions (christophervilliva767@gmail.com) has completed all exams in the COE + Power exam group and is qualified to perform COE + Power work in Qwest Central Office locations.

October 2011 – Present

AirMagnetSurvey

AirMagnet

April 2012 – Present

EDUCATION

Calhoun High School

1984 – 1988

 

 

 

 

 

 

 

 

 

References

Kevin Rosa

Quanta Wireless

870-321-4630

 

Tony Valcencia

Ericsson CM

570-955-6193

 

Artie Benthall

T-Mobile CM

 

Kevin Valler

T-Mobile CM

410-320-1662

 

Shawn Bonner

Integration for T-Mobile

301-237-7742

 

Mario Wills

Integration for T-Mobile

810-280-0121

 

 

William Berry

Integration for T-Mobile

251-545-2724

 

Edward Jordan

Integration for T-Mobile

347-484-1896

 

William Drake

Intergration for Nokia

336-541-2858

 

 

 

 

 

 

 



Experience

BACK TO TOP

 

Job Title

Company

Experience

Field Engineer Telecommunications

C4 Technical Services

- Present

 

Additional Info

BACK TO TOP

 

Desired Salary/Wage:

35.00 - 40.00 USD hr

Current Career Level:

Manager (Manager/Supervisor of Staff)

Years of relevant work experience:

10+ to 15 Years

Date of Availability:

Immediately

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

Citizenship:

Permanent resident

 

 

Target Job:

Target Job Title:

Field Engineer Telecommunications

Desired Job Type:

Employee
Intern
Temporary/Contract/Project

Desired Status:

Full-Time
Part-Time
Per Diem

 

Target Company:

Company Size:

Industry:

Chemicals/Petro-Chemicals
Telecommunications Services

Occupation:

Installation/Maintenance/Repair

·         Computer/Electronics/Telecomm Install/Maintain/Repair

·         Wire and Cable Install/Maintain/Repair

 

Target Locations:

Selected Locations:

US-KS-Kansas City
US-KS-Overland Park

Relocate:

Yes

Willingness to travel:

Up to 100%

 

Languages:

Languages

Proficiency Level

English

Advanced